Joints sawn at the right time, to the right depth — so slabs don't crack wherever they feel like it.
Pouring a new slab — garage, warehouse, parking pad, commercial floor? If you don't saw your control and expansion joints, the concrete will crack wherever it wants, and it will show. Joint sawing is a precision-and-timing job: cut at the right moment, to the right depth, at the right spacing. We serve concrete contractors, flatwork crews and builders across Ottawa-Gatineau, with volume pricing for larger sites.
Need slab or wall sawing for trenches or openings on the same project? We bundle it into one visit.
Concrete shrinks as it cures — that's unavoidable. A sawn joint is a deliberate weak line that tells the crack where to run: below the joint, hidden, where it does no harm. No joint, or a joint sawn too late or too shallow? The slab cracks wherever it wants, diagonally, right through the middle of panels — and at that point there's no fixing it. Missing the green-cutting window by a day can wreck the look of a $50,000 slab. That's why good flatwork contractors schedule the sawing from day one, not as an afterthought. We work with your crew, not against it: tell us when you're pouring and we'll book the saw. We also keep spare blades and a backup saw on the truck, because a breakdown at hour six of a green-cut window is not an acceptable excuse.
A typical example: a 4,000 ft² slab for a commercial garage in Ottawa, poured in two stages. We were on site the evening of the first pour for green cutting and finished the full jointing the next day — roughly 900 linear feet of joints. Zero shrinkage cracks at inspection, and a happy contractor who's called us back for every pour since.
Saw line and drain
Basement before sawingJoint sawing generally runs $2 to $4 per linear foot depending on depth, reinforcement and access — or a day rate for larger sites. A minimum trip charge applies to small jobs. Contractor volume pricing: call us to set up a rate.
Early entry, generally 4 to 12 hours after the pour, as soon as the concrete holds the saw without ravelling the aggregate. Waiting too long means the concrete cracks on its own before we arrive.
The usual rule is one quarter to one third of slab thickness for depth, and spacing of roughly 24 to 36 times the thickness. We adjust for the mix, the reinforcement and how the slab will be used.
Yes. Joint sawing is recurring work for formers, builders and concrete contractors — we set a linear-foot rate for regular contracts.
Yes. Early-entry sawing is scheduled by the concrete's set time, not by our office hours. We come when the slab is ready, including nights and weekends.